QLDC Threepwood Stormwater
Hadleys undertook the upgrading of an area of undersized stormwater network where regular flooding and erosion was occurring. This included the following:
- Catchment and hydrological assessment to determine peak flows;
- Detailed design and documentation of 750mm stormwater main including rock lined inlet channel and outlet energy dissipation structures;
- Procurement and value engineering to ensure that the project could be completed within available budgets;
- Construction monitoring and contract management to deliver the project under budget.