1st December 2019
The Kingston Village Subdivision is a 750 lot development south of the Kingston township. It has been confirmed as one of the Government’s Housing Infrastructure Fund projects to increase the supply of residential housing across New Zealand. Once all stages…
Read More1st December 2018
Hadleys undertook the upgrading of an area of undersized stormwater network where regular flooding and erosion was occurring. This included the following: Catchment and hydrological assessment to determine peak flows; Detailed design and documentation of 750mm stormwater main including rock lined…
Read More1st November 2018
One of the largest local highway projects in recent times, completed successfully on a challenging site.
Read More1st August 2018
Camp Glenorchy is New Zealand’s first Net Zero Energy accommodation facility developed in accordance with the Living Building Challenge framework. It includes camping, campervan sites, serviced cabins, communal kitchen and gathering areas, multi purpose function facilities and on-site staff accommodation…
Read More1st October 2016
Hadleys were involved in the site works for the Eastgate Shopping Centre in Christchurch when a new KFC restaurant was added to the existing shopping centre. Our role included the initial site investigation, followed by site works design and documentation,…
Read More1st July 2016
Highground is a high quality, 4 lot rural subdivision in the Wakatipu Basin. Hadleys were involved from the project’s inception and were responsible for developing the master programme and staging strategy, managing consent compliance, completing a Resource Consent for water…
Read More1st December 2015
Hadleys carried out the civil engineering design and construction monitoring at Mitre 10 Mega in Shotover Park, Frankton. This involved the design of on site stormwater and sewer drainage reticulation, water supply, access roading and carpark and site earthworks on…
Read More1st November 2015
A 1.2km section of the Malaghans Road pavement near Arrowtown was rehabilitated using Foam Bitumen Stabilisation along with associated improvements including minor geometric improvements, culvert extensions and headwall construction, entrance way and intersection improvements, power pole relocation, and drainage improvements….
Read More1st June 2012
This project won the Silver Award of Excellence at the ACENZ Innovate NZ Awards, 2014 The Milford Sound Freshwater Basin harbour is a fundamental element of New Zealand’s tourism infrastructure and is located in an iconic New Zealand landscape. During…
Read More1st June 2009
Our work on the Coronet Peak Ski Area Snow Making Infrastructure and Reservoirs was recognised in 2010 when Hadley Consultants won the Supreme Award at the New Zealand Engineering Excellence Awards.
Read More